Active challenge

Mekong household energy-resilience model

Challenge validation

Residential and SME ClimateTech Working prototype, pilot conversations, and feasibility paper

Owner Programme working group
Week 13 Jul
Next gate Validate challenge area and assign faculty supervisor
Risk Local energy data availability and field validation
Sprint readiness
20% ready

Current state is strong enough to scope the student prototype, but still needs field data and faculty confirmation.

Challenge areas 3-5 Validate by mid July
Students per team 3-5 Plus mentor and supervisor
Internal demo 24 Aug Working-group review
Sprint close 26 Sep October Forum: presentation stage
Operating model

Anchor, operator, ecosystem

The host university anchors the sprint; The Improbability Company supplies the operating spine.

Anchor Host university

Institutional anchor; leads challenge identification, faculty engagement, student pathways, and governance. Set by programme admin.

Operator The Improbability Company

Programme delivery, partner orchestration, sprint coordination, and the commercial pathway.

Ecosystem Managed in programme records

Partner and ecosystem relationships are recorded in the database by admin once they are real.

Programme map

90-day sprint and decision gates

The sprint runs 1 July to 26 September 2026. The October Innovation Forum is the selection and presentation stage that follows.

1 Jul Kick-off and governance Operating spine active
6 Jul Challenge definition Draft challenge cards
13 Jul Challenge validation Sprint briefs approved
20 Jul Team formation Teams registered
27 Jul Challenge brief lock Challenge card locked
3 Aug Field discovery Pain and constraints evidenced
10 Aug Prototype plan Prototype scope approved
17 Aug Build sprint Evidence-backed build
24 Aug Internal demo Progress inspected
31 Aug Build iteration Iterated artefact
7 Sep Mid-sprint review Acceleration decision
14 Sep Pilot pathway Pilot options visible
21 Sep Showcase pack and close Sprint closes 26 September
Challenge areas

2026 focus map

Two core pillars and two adjacent streams. Partner records are managed by programme admin in the database.

Core pillar 01 Draft
Enterprise RegTech Managed by programme admin

Workforce compliance workflows adapted for the Vietnamese enterprise context.

Core pillar 02 Draft
Residential / SME ClimateTech Managed by programme admin

Mekong household and SME climate adaptation and energy resilience.

Adjacent stream A Draft
Mekong energy and grid research Managed by programme admin

Distributed energy and grid-support research drawing on faculty expertise where relevant.

Adjacent stream B Draft
AgriTech / AquaTech Managed by programme admin

Mekong agritech and aquatech challenge stream.

Sprint board

Challenge areas moving through gates

Server-backed state: new briefs, evidence, review gates, and team edits persist to the programme database with a full activity history.

Team formation

Student + mentor teams

Each challenge needs 3-5 students, one faculty supervisor, and one engineer mentor.

Challenge engine

Sprint brief builder

Convert a focus area into a student challenge card.

Generated sprint card

Mekong household energy-resilience model

Stakeholder
Mekong households, SMEs, and local energy partners
Context
Residential and SME users need practical resilience models for climate and energy stress in the Mekong context.
Output
Working prototype, two pilot conversations, and feasibility paper
Evidence workspace

Governance, fieldwork, and pilot evidence

Type Challenge Signal Owner
Founderverse router

158 Founderverse resources, applied to CT2030 stages

Define: challenge and discovery 21
Design: solution and prototype 15
Build: alpha and internal demo 22
Pilot: metrics and partner path 21
Showcase: handoff and adoption 50
General reference 29
Student team review

Sprint gate checklist

Students need supervisor, mentor, prototype, field evidence, and showcase artefact readiness.

0 of 7 complete
Weekly score

Rubric cockpit

Adjust the sliders to see sprint readiness across challenge clarity, field evidence, technical work, and pilot path.

Total score 0 out of 100
Next decisions

Working-group asks

The app should make these deadlines visible and auditable.

  1. Confirm the working group and focal points by 1 July 2026.
  2. Agree criteria for selecting the first challenge areas.
  3. Validate challenge areas by mid July 2026.
  4. Staff each sprint team with students, one engineer mentor, and one faculty supervisor.
  5. Close the sprint on 26 September 2026 with showcase packs ready for the October Innovation Forum.
October Innovation Forum

Presentation stage

The Forum is the selection and presentation stage after sprint close — it is not a programme gate.

  1. October Innovation Forum: selection and presentation stage after sprint close
  2. Sprint showcase by student and faculty teams
  3. Curated meeting blocks for stakeholders
  4. Forward look at pilot and incubation pathways