Residential and SME ClimateTechWorking prototype, pilot conversations, and feasibility paper
OwnerProgramme working group
Week13 Jul
Next gateValidate challenge area and assign faculty supervisor
RiskLocal energy data availability and field validation
Sprint readiness
20%ready
Current state is strong enough to scope the student prototype, but still needs field data and faculty confirmation.
Challenge areas3-5 Validate by mid July Students per team3-5 Plus mentor and supervisor Internal demo24 Aug Working-group review Sprint close26 Sep October Forum: presentation stage
Operating model
Anchor, operator, ecosystem
The host university anchors the sprint; The Improbability Company supplies the operating spine.
AnchorHost university
Institutional anchor; leads challenge identification, faculty engagement, student pathways, and governance. Set by programme admin.
OperatorThe Improbability Company
Programme delivery, partner orchestration, sprint coordination, and the commercial pathway.
EcosystemManaged in programme records
Partner and ecosystem relationships are recorded in the database by admin once they are real.
Programme map
90-day sprint and decision gates
The sprint runs 1 July to 26 September 2026. The October Innovation Forum is the selection and presentation stage that follows.
1 JulKick-off and governance Operating spine active 6 JulChallenge definition Draft challenge cards 13 JulChallenge validation Sprint briefs approved 20 JulTeam formation Teams registered 27 JulChallenge brief lock Challenge card locked 3 AugField discovery Pain and constraints evidenced 10 AugPrototype plan Prototype scope approved 17 AugBuild sprint Evidence-backed build 24 AugInternal demo Progress inspected 31 AugBuild iteration Iterated artefact 7 SepMid-sprint review Acceleration decision 14 SepPilot pathway Pilot options visible 21 SepShowcase pack and close Sprint closes 26 September
Challenge areas
2026 focus map
Two core pillars and two adjacent streams. Partner records are managed by programme admin in the database.
Core pillar 01 Draft
Enterprise RegTech Managed by programme admin
Workforce compliance workflows adapted for the Vietnamese enterprise context.
Core pillar 02 Draft
Residential / SME ClimateTech Managed by programme admin
Mekong household and SME climate adaptation and energy resilience.
Adjacent stream A Draft
Mekong energy and grid research Managed by programme admin
Distributed energy and grid-support research drawing on faculty expertise where relevant.
Adjacent stream B Draft
AgriTech / AquaTech Managed by programme admin
Mekong agritech and aquatech challenge stream.
Sprint board
Challenge areas moving through gates
Server-backed state: new briefs, evidence, review gates, and team edits persist to the programme database with a full activity history.
Team formation
Student + mentor teams
Each challenge needs 3-5 students, one faculty supervisor, and one engineer mentor.
Challenge engine
Sprint brief builder
Convert a focus area into a student challenge card.
Generated sprint card
Mekong household energy-resilience model
Stakeholder
Mekong households, SMEs, and local energy partners
Context
Residential and SME users need practical resilience models for climate and energy stress in the Mekong context.
Output
Working prototype, two pilot conversations, and feasibility paper
Evidence workspace
Governance, fieldwork, and pilot evidence
TypeChallengeSignalOwner
Founderverse router
158 Founderverse resources, applied to CT2030 stages
Define: challenge and discovery21Design: solution and prototype15Build: alpha and internal demo22Pilot: metrics and partner path21Showcase: handoff and adoption50General reference29
Student team review
Sprint gate checklist
Students need supervisor, mentor, prototype, field evidence, and showcase artefact readiness.
0 of 7 complete
Weekly score
Rubric cockpit
Adjust the sliders to see sprint readiness across challenge clarity, field evidence, technical work, and pilot path.
Total score0 out of 100
Next decisions
Working-group asks
The app should make these deadlines visible and auditable.
Confirm the working group and focal points by 1 July 2026.
Agree criteria for selecting the first challenge areas.
Validate challenge areas by mid July 2026.
Staff each sprint team with students, one engineer mentor, and one faculty supervisor.
Close the sprint on 26 September 2026 with showcase packs ready for the October Innovation Forum.
October Innovation Forum
Presentation stage
The Forum is the selection and presentation stage after sprint close — it is not a programme gate.
October Innovation Forum: selection and presentation stage after sprint close
Sprint showcase by student and faculty teams
Curated meeting blocks for stakeholders
Forward look at pilot and incubation pathways
CT
Sign in to the Challenge OS
The Improbability Company Challenge OS — built for Cần Thơ 2030. Enter your email and we will send you a one-time sign-in link.